RESOLUTION NO. 27, S.2019 – REQUESTING THE NATIONAL WATER RESOURCES BOARD (NWRB) FOR AN EXTENSION OF TIME OF THIRTY (30) DAYS TO GATHER PERTINENT DOCUMENTS AND EVIDENCES FOR POSSIBLE FILING OF A VERIFIED PROTEST BEFORE CONSIDERATION OF THAT OFFICE OF THE GRANTING OF THE WATER PERMIT APPLICATION TO CONSOLACION WATER SYSTEM, INC. FOR WATER SURFACE WATER / GROUNDWATER UNDER WPA NO. VII-CEB-2018-11-227 LOCATED AT BARANGAY TILHAONG, CONSOLACION, CEBU.